Tag: Prefabricated Shed

  • 10′ x 8′ Prefab Craftsman Garden Shed

    10′ x 8′ Prefab Craftsman Garden Shed

    10′ x 8′ Prefab Craftsman Garden Shed

    Westcoast Outbuildings is please to showoff our most recent build a beautiful 10′ x 8′ Prefab Craftsman Garden Shed in Richmond BC.

    Prefab Craftsman Garden Shed
    10′ x 8′ Prefab Craftsman Garden Shed

     

    View the FULL Project Profile HERE

  • Too Much Time Spent Building? A Sneak Peek at Our 2013 Projects

    Too Much Time Spent Building? A Sneak Peek at Our 2013 Projects

    Too much time building, not enough time promoting?

    It’s a good problem to have, but we haven’t kept you in the loop on what we’ve been building. We went back through the projects we finished in 2013 and found that most of them never got photos on the site. We were too busy building to promote.

    We’re close to posting photo galleries for all 33 of our 2013 projects. Here’s a sneak peek at one of our favourites from the year.

    12×12 backyard workout room in West Vancouver

    We finished this one in the spring for a well-known Vancouver restaurateur. It’s a 12×12 modern prefab shed set up as a workout room, with a wrap-around Trex deck. And who can forget the outdoor shower?

    Outbuildings.ca-Backyard-Workout-Room
    12×12 backyard workout room in West Vancouver with sliding glass doors, clerestory windows and a large composite deck

    See the full photo gallery of this West Vancouver workout room.

    Tell us what you think in the comments below.

  • Prefab Writers Studio: Bliss in a Box

    Prefab Writers Studio: Bliss in a Box

    Prefab Writers Studio

    Prefab Writers Studio

    When Kristen Hall-Geisler used to work from her home’s spare bedroom turned home office, she found herself wasting a lot of time. It got her thinking about a prefab writers studio.

    “I would think, ‘I should be working. I should be writing this article,’” recalls Kristen, a freelance automotive writer and book editor. “Instead, I’d putter around and read and go downstairs and then realize I hadn’t gotten any work done.”

    (more…)